Concordo e autorizo receber notícias, atualizações e outras comunicações por e-mail da Lithium Ionic. Entendo que posso retirar o consentimento a qualquer momento clicando no link de cancelamento contido em todos os e-mails de info@lithiumIonic.com.
Lithium Ionic informa resultados iniciais das perfurações do projeto Salinas, Minas Gerais; intercepta 1,38% de Li2O em 16 m e 1,60% de Li2O em 12 m
View PDF version of this release: ENGLISH | GERMANTORONTO, ON, July 25, 2023 – Lithium Ionic Corp. (TSXV: LTH; OTCQB: LTHCF; FSE: H3N) (“Lithium Ionic” or the “Company”) reports initial results from a planned 20,000-metre drill program at the Salinas Lithium Project (“Salinas”). Drilling commenced in May 2023, following the acquisition of Salinas in March (see press release dated March 13, 2023).
Salinas is located approximately 100 kilometres north of its Itinga Lithium Project (Bandeira and Outro Lado lithium deposits), within the lithium-rich Araçuaí Pegmatite District in the northern region of Minas Gerais State, Brazil (see Figure 1). The Company is currently drilling to test and delineate multiple outcropping spodumene-rich pegmatite bodies identified by surface sampling and drilling in 2022 by the vendor. The Salinas mineralized pegmatite veins extend directly east of Latin Resources’ Colina lithium deposit, which is reported to contain 45.2Mt grading 1.34% Li2O.
Salinas Drill Intercept Highlights:
- 1.38% Li2O over 16m intersected near surface from 40.4m represents the strongest intercept to date at Salinas from a grade X width perspective
(hole BGDD-23-032) - 1.60% Li2O over 12m from 68.2m (hole BGDD-23-025)
- 1.55% Li2O over 9m from 129m (hole BGDD-23-027)
- 1.26% Li2O over 11m from 63m (hole BGDD-23-029)
- 1.34% Li2O over 10m from 94m (hole BGDD-23-030)
Blake Hylands, P.Geo., Chief Executive Officer of Lithium Ionic, commented, “The initial results from Salinas confirm continuity of lithium mineralization with good grades and widths between the wide spaced drill holes completed in 2022 by the previous owner. These results, along with the significant growth seen at the Colina deposit only 500 metres west of our drilling site, as well as numerous historical artisanal workings that span decades of activity to the east, provide a strong indication of the potential for Salinas to quickly develop into an important part of our growing portfolio of lithium deposits.”
In 2022, the previous owner of the Salinas properties, Neolit Minerals Participações Ltda. (“Neolit”), completed a 4,000-metre, 24-hole, drill program which yielded excellent results, including highlights of 1.53% Li2O over 11.4m, 1.22% Li2O over 13.8m, 1.71% Li2O over 9.8m and 1.19% Li2O over 13.4m. Since acquiring Salinas in March 2023 from Neolit, Lithium Ionic has completed soil geochemistry on select areas of the property, collecting a total of ~770 samples, to help identify priority drill targets.
The 20,000-metre drill program at Salinas forms part of a larger 50,000 metre drill program underway for H2 2023, targeting the Company’s other high priority growth targets at the Itinga Lithium Project, the Bandeira and Outro Lado lithium deposits (NI 43-101 mineral resource estimate of 7.57Mt grading 1.40% Li2O of M&I and 11.86Mt grading 1.44% Li2O of Inferred resources), as well as the adjacent Itira target. Lithium Ionic presently has thirteen drills operating at four different deposit areas.
Figure 1. Salinas Lithium Project Location & Drill Intercept Highlights
Table 1. Salinas Drill Results
Hole ID | Az | Dip | From | To | Metres | Li2O (%) |
BGDD-23-025 | 310 | -60 | 68.22 | 80.22 | 12 | 1.60 |
BGDD-23-026 | 310 | -72 | nsv | |||
BGDD-23-027 | 310 | -87 | 117.93 | 122.93 | 5 | 0.78 |
and | 128.93 | 137.93 | 9 | 1.55 | ||
BGDD-23-028 | 0 | -90 | nsv | |||
BGDD-23-029 | 310 | -61 | 62.94 | 73.94 | 11 | 1.26 |
BGDD-23-030 | 310 | -65 | 94.16 | 104.16 | 10 | 1.34 |
BGDD-23-031 | 0 | -90 | 162.02 | 165.02 | 3 | 0.74 |
BGDD-23-032 | 310 | -60 | 40.38 | 56.38 | 16 | 1.38 |
About Lithium Ionic Corp.
Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its flagship Itinga and Salinas projects cover 14,182 hectares in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. The Itinga Project is situated in the same region as CBL’s Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.’s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.
Quality Assurance and Control
During the drill program, assay samples were taken from NQ core and sawed in half. One-half was sent for assaying at SGS Laboratory, a certified independent commercial laboratory, and the other half was retained for results, cross checks, and future reference. A strict QA/QC program was applied to all samples. Every sample was processed with Drying, crushing from 75% to 3 mm, homogenization, quartering in Jones, spraying 250 to 300 g of sample in steel mill 95% to 150. SGS laboratory carried out multi-element analysis for ICP90A analysis.
Qualified Persons
The technical information in this news release has been prepared by Carlos Costa, Vice President Exploration of Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic, and both are “qualified persons” as defined in NI 43-101.
The technical information relating to the historical exploration conducted by Neolit is historical in nature and has not been independently verified by Lithium Ionic. A qualified person, as defined in National Instrument 43-101, has not done sufficient work on behalf of Lithium Ionic to classify the historical drilling reported above as current mineral resources or mineral reserves and Lithium Ionic is not treating the historical drill results as current mineral resources or mineral reserves.
Investor and Media Inquiries:
+1 647.316.2500
info@lithiumionic.com
Cautionary Note Regarding Forward-Looking Statements
This press release contains statements that constitute “forward-statements.” Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Although the Company believes, in light of the experience of its officers and directors, current conditions and expected future developments and other factors that have been considered appropriate that the expectations reflected in this forward-looking information are reasonable, undue reliance should not be placed on them because the Company can give no assurance that they will prove to be correct. When used in this press release, the words “estimate”, “project”, “belief”, “anticipate”, “intend”, “expect”, “plan”, “predict”, “may” or “should” and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. The forward-looking statements and information in this press release include information relating to the prospectivity of the Company’s mineral properties, including Salinas, the mineralization and development of the Company’s mineral properties, the Company’s exploration program and other mining projects and prospects thereof. Such statements and information reflect the current view of the Company. Risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management’s beliefs, estimates or opinions, or other factors, should change.
Information and links in this press release relating to other mineral resource companies are from their sources believed to be reliable, but that have not been independently verified by the Company.
Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press release.